Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Planner view

Target location

Activity to call the information box

Timeline

Targets panel

  • Click a target. The target's information box opens. 

Timeline

Gantt chart

  • Click a target line, and then select View, or Edit. The target's information box opens.

List

Targets table

  • In the table, click a target. The target's information box opens.

...

This section describes how to fully inspect the target information. There are three tables in the dialog box sidebar of a target, and each table contains connected targets.

.To inspect the connected targets' information:

  • In the Includes table, click a target.
    The system opens the information dialog box of sidebar with the included target.

  • In the Contributes To table, click a target.
    The system opens the information dialog box of sidebar with the target that contributes to the main target.

  • In the Dependencies table, click a target.
    The system opens the information dialog box of sidebar with the dependent target.

...

2.1 Jump to a Target

To jump to a target:

  1. In the Target panepanel, pause on a target, and then click the arrow on the right.

...

To jump to a linked target from the Gantt chart:

  1. On the Gantt chart, click the respective link icon. The system jumps to the linked remote target.

...