This section describes how to link a target with other targets to see the entire process of achieving the planned goals.
You can link targets in two Planner entities:
Target's sidebar
Gantt chart
1. Link in the sidebar
The information sidebar of any target contains three tables intended for linking the target with other targets.
Type of link | How to |
---|---|
Includes |
|
Contributes To |
|
Dependencies |
|
2. Link in the Gantt Chart
This section describes how to link targets in the Gantt chart by means of dragging a connector between targets.
To link a target:
Pause on a target. The system displays points on both ends of the target.
Click the point and drag the connector to a required target to link.
Drop the connector on the required target. The Add Connection sidebar opens.
Specify the type of link: Hard link or Soft link.
If you selected Hard link, specify the type of dependency, as one of the following:
Finish to start
Start to finish
Finish to finish
Start to start
Click Save.