  • criteria Project settings>Scope management>Issue types to track scope readiness for development;
  • criteria Project settings>Scope management>Track changes in requirements.

Track changes in requirements works as follows:

1. Fields within one Issue field are connected with the logical AND. So if only all selected fields are changed in a requirement, it means a change. 

Example:

A bug is counted in the metric as a changed requirement if all criteria below are met:

  1. "Story points" and "Time remaining" and "Region" are changed within a considered period;
  2. or "Time estimate" is changed within a considered period;
  3. or "Story points" and "Actual outcome" are changed within a considered period.

Image Added2. Issue fields are connected with the logical OR. 

RAG thresholds:  Red - metric value ≥ 5; Amber - 2 < metric value < 5; Green - metric value ≤ 2. 

...