This section describes how to view detailed information about a target.
1. Open a target
This section describes how to open a target via Timeline or List View.
Planner view | Target location | How to open a target |
---|---|---|
Timeline | Targets table | Click a target |
Timeline | Gantt chart | Click a target and choose “Open” |
List | Targets table | Hover a target and click “Open” button |
.2. View Target Information
This section describes how to fully inspect the target information. There are three tables in the sidebar of a target, and each table contains connected targets.
.To inspect the connected targets' information:
In the Includes table, click a target.
The system opens the information sidebar with the included target.In the Contributes To table, click a target.
The system opens the information sidebar with the target that contributes to the main target.In the Dependencies table, click a target.
The system opens the information sidebar with the dependent target.
2.1 Jump to a Target
To jump to a target:
In the Target panel, pause on a target, and then click the arrow on the right.
To jump to a linked target from the Gantt chart:
On the Gantt chart, click the respective link icon. The system jumps to the linked remote target.