Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

This section describes how to view detailed information about a target.

1. Open a target

This section describes how to open a target via Timeline or List View.

Planner view

Target location

How to open a target

Timeline

Targets table

Click a target

Timeline

Gantt chart

Click a target and choose “Open”

List

Targets table

Hover a target and click “Open” button image-20241002-150859.png

.2. View Target Information

This section describes how to fully inspect the target information. There are three tables in the sidebar of a target, and each table contains connected targets.

.To inspect the connected targets' information:

  • In the Includes table, click a target.
    The system opens the information sidebar with the included target.

  • In the Contributes To table, click a target.
    The system opens the information sidebar with the target that contributes to the main target.

  • In the Dependencies table, click a target.
    The system opens the information sidebar with the dependent target.

2.1 Jump to a Target

To jump to a target:

  1. In the Target panel, pause on a target, and then click the arrow on the right.

To jump to a linked target from the Gantt chart:

  1. On the Gantt chart, click the respective link icon. The system jumps to the linked remote target.

  • No labels