Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

Purpose

Time Spent On Bug Fixing shows how much time in % of all logged time a team spends on defects fixing.

How metric helps

Time Spent On Bug Fixing helps to monitor and optimize efforts spent on fixing defects. It is suggested to spend < 20 % of all time on fixing defects.

How metric works

Chart overview

Chart shows a percentage of time spent on fixing defects - number in the center. Target value is is above the chart.  

By click on a chart a pop up appears with the following information got from the task tracking system: 

  • Issue ID

  • Type

  • Priority

  • Summary

Calculation

Time Spent On Bug Fixing = (time logged for defects / all logged time) *100. 

RAG thresholds:  Red - metric value > 20; Green - metric value = < 20. 


Assumptions

1 Calculation considers created items within the last 90 days.

2 Defect is an item of a type set in Project Configuration > Data Sources > Task Tracking System> Quality Management > Issue/Work Item type used for defects tracking.


Data Source

Data for the metric can be collected from a task tracking system (Jira, TFS, Rally, etc.).

See also

Copyright © 2024 EPAM Systems, Inc.

All Rights Reserved. All information contained herein is, and remains the property of EPAM Systems, Inc. and/or its suppliers and is protected by international intellectual property law. Dissemination of this information or reproduction of this material is strictly forbidden, unless prior written permission is obtained from EPAM Systems, Inc.




  • No labels